
![]() |
Mark Sennett
Managing Editor |
![]() |
Kelly Rose
Editor |
Home> | Handling & Storing | >Lifting Equipment | >Double deck dock |
ARTICLE
Double deck dock
23 January 2013
A new double deck scissor lift modular dock pod designed, manufactured and installed by Easilift Loading Systems is reported to have significantly increased loading/unloading efficiency for the TIC Retail Accessories Gr

A new double deck scissor lift
modular dock pod designed,
manufactured and installed by
Easilift Loading Systems is reported
to have significantly increased
loading/unloading efficiency for the
TIC Retail Accessories Group.
Thanks to its modular construction, the double deck scissor lift dock pod solution took less than two days to install - far exceeding customer expectations and ensuring that a contract was able to start on time.
Quick and easy to erect, without disruption to the company's ongoing business operations, it did not require any major civil engineering work or building modifications.
Thanks to its modular construction, the double deck scissor lift dock pod solution took less than two days to install - far exceeding customer expectations and ensuring that a contract was able to start on time.
Quick and easy to erect, without disruption to the company's ongoing business operations, it did not require any major civil engineering work or building modifications.
MORE FROM THIS COMPANY
OTHER ARTICLES IN THIS SECTION