ARTICLE

Double-deck

23 January 2013

With increasing pressure on logistics professionals to switch to double-deck trailers, Easilift Loading Systems has devised a simple, effective process to make a loading dock ready for double-deck loading in just two day

With increasing pressure on logistics professionals to switch to double-deck trailers, Easilift Loading Systems has devised a simple, effective process to make a loading dock ready for double-deck loading in just two days.

It has also launched a free downloadable brochure to show it in action, available at www.easilift.co.uk.

The new installation process is being introduced because of a lack of awareness in the industry that double-deck loading requires a totally different loading bay configuration to traditional single-deck procedures.

Attempting to use the wrong equipment is time-consuming and potentially dangerous for warehouse operators. Easilift's solution replaces an existing conventional singletrailer dock leveller bay with a bespoke scissor lift solution that can service both single- and double-deck vehicles.
 
OTHER ARTICLES IN THIS SECTION
FEATURED SUPPLIERS
TWITTER FEED
 
//