Mark Sennett
Managing Editor |
Kelly Rose
Editor |
Home> | Slips, Trips & Falls | >Fall Prevention | >Scaffolding inspection |
ARTICLE
Scaffolding inspection
23 January 2013
In addition to providing inspection tagging solutions, over the last 27 years Scafftag has engineered hundreds of ways to help the scaffolding industry save time, money and, importantly, comply with the European Standar
In addition to providing inspection
tagging solutions, over the last 27
years Scafftag has engineered
hundreds of ways to help the
scaffolding industry save time, money
and, importantly, comply with the
European Standard BS EN 12811-
1:2003, which the UK scaffolding
industry should be fully compliant
with by the end of 2010.
Scaffolding must be inspected prior to being used for the first time, following exposure to weather conditions that are likely to have affected its strength or stability, after substantial addition, dismantling or other alteration and at intervals not exceeding seven days from the date of last inspection.
Scafftag supplies a complete range of scaffold inspection systems to help prevent working at height hazards and efficiently manage scaffolding inspection procedures.
Scaffolding must be inspected prior to being used for the first time, following exposure to weather conditions that are likely to have affected its strength or stability, after substantial addition, dismantling or other alteration and at intervals not exceeding seven days from the date of last inspection.
Scafftag supplies a complete range of scaffold inspection systems to help prevent working at height hazards and efficiently manage scaffolding inspection procedures.
MORE FROM THIS COMPANY
OTHER ARTICLES IN THIS SECTION