
![]() |
Mark Sennett
Managing Editor |
![]() |
Kelly Rose
Editor |
Home> | Slips, Trips & Falls | >Fall Protection | >Stadium safety kicks off |
ARTICLE
Stadium safety kicks off
23 January 2013
Uniline was part of the winning team that helped create Durban's Mabhida Stadium, which was purpose built for the 2010 FIFA World Cup. This large scale, complex project provided plenty of opportunity for Uniline Safety

Uniline was part of the winning team
that helped create Durban's Mabhida
Stadium, which was purpose built for
the 2010 FIFA World Cup. This large
scale, complex project provided
plenty of opportunity for Uniline
Safety Systems to offer fall protection
system design advice and solutions to
its approved installer, Specialized
Access Services (SAS).
The complex stadium design required special interface brackets to mount the fall protection system, which Uniline was able to design, ensuring a high level of functionality and performance. A visitor viewing platform on the stadium's centre arch was fitted with Uniline's fall arrest system, while the company's Uni-16 system provides safe access for multiple maintenance personnel working on the compression and tension rings around the stadium.
Four EasyClimber systems were also installed for safe vertical access on ladders.
The complex stadium design required special interface brackets to mount the fall protection system, which Uniline was able to design, ensuring a high level of functionality and performance. A visitor viewing platform on the stadium's centre arch was fitted with Uniline's fall arrest system, while the company's Uni-16 system provides safe access for multiple maintenance personnel working on the compression and tension rings around the stadium.
Four EasyClimber systems were also installed for safe vertical access on ladders.
MORE FROM THIS COMPANY
OTHER ARTICLES IN THIS SECTION