Members of the public injured in scaffold tower collapse
A LONDON construction company and its sole director have been fined after a tower scaffold fell onto two members of the public on a busy high street in south-west London.

On 19 July 2023, operatives working for Add Prop Limited assembled a mobile tower scaffold on Putney High Street while under the supervision of the company’s sole director, Atif Riaz. The scaffold tower, which had been assembled incorrectly with inadequate measures to separate it from members of the public, was subsequently covered in sheeting.
The sheeting acted as a sail in windy conditions, causing the tower scaffold to overturn. The structure struck and trapped two members of the public, resulting in serious injuries.
Add Prop Limited was acting as principal contractor on a project to convert a commercial building into residential flats. Mr Riaz was both the project manager and site supervisor and was present overseeing the work on the day of the incident.
An investigation by the Health and Safety Executive (HSE) found that Add Prop Limited had failed to ensure the temporary structure was designed, installed and maintained so that it could withstand foreseeable loads, including those created by wind acting on the sheeting. The company had previously been served with a Prohibition Notice in relation to unsafe work involving a tower scaffold at another site.
The investigation also found that the tower scaffold had neither been assembled nor inspected by adequately trained and competent persons. It had not been erected in accordance with the manufacturer’s instructions or established industry guidance.
HSE further found that Atif Riaz had been negligent in his role as both sole director and project manager. Despite the well-known risks associated with wind loading on scaffold structures, neither the company nor Mr Riaz took adequate account of those risks before deciding to sheet the scaffold.
HSE guidance states that tower scaffolds must be erected by trained and competent persons and in accordance with manufacturers’ instructions. Dutyholders must also ensure temporary structures are stable and capable of withstanding foreseeable environmental conditions, including wind loading. Further guidance can be found at: Tower scaffolds – HSE.
Following a hearing at Westminster Magistrates’ Court, Add Prop Limited was found guilty of breaching Regulation 19(2)(a) of the Construction (Design and Management) Regulations 2015. The company was fined £20,000 and ordered to pay £7,000 in costs.
Atif Riaz, the company’s sole director, was found guilty of an offence under Section 37 of the Health and Safety at Work etc. Act 1974. He was fined £1,730 and ordered to pay £1,730 in costs.
HSM publishes a weekly eNewsletter, delivering a carefully chosen selection of the latest stories straight to your inbox.
Subscribe here