Tailored loading bay design

Posted on Friday 1 January 2010

The engineering capability and
manufacturing flexibility of
distribution solutions provider,
Easilift Loading Systems, is reported
to have been instrumental in
creating the unique design interface
of loading bays at Tes

The engineering capability and
manufacturing flexibility of
distribution solutions provider,
Easilift Loading Systems, is reported
to have been instrumental in
creating the unique design interface
of loading bays at Tesco’s Grocery
Distribution Centre.

As Tesco’s flagship distribution
centre, the 800,000ft2 facility at
Daventry is said to mark an
ambitious advance in loading bay
design, made possible in part by
Easilift’s 3D modelling CAD
software – a key element of the
£6.5m bespoke project, the largest
single order ever placed in the UK
for loading bay equipment.

The unique elements of the
project reflect Easilift’s ability to
provide a tailored solution in which
the dock pods have been designed
and installed to the specific
parameters of the overall building.

HSM Newsletter

HSM publishes a weekly eNewsletter, delivering a carefully chosen selection of the latest stories straight to your inbox.

Subscribe here
Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Kelly Rose - HSM Editor
01342 314300
[email protected]

Christine Knapp - Commercial Head
01342 333740
[email protected]

Paul Miles - Sales Manager
01342 333 743
[email protected]

Louise Carter - Editorial Support
01342 333735
[email protected]

Sharon Miller - Production Manager
01342 333741
[email protected]

Health & Safety Matters