Clearing the air October 1st 2007 Three Kubota mini
excavators working on
demolishing internal
structures and floors of a
multi-storey building in
Leeds city centre have been
fitted with a specialised
exhaust gas purification
system.
Venco Plant Services hired
out the modified Kubota
KX41-3 mini excavators to
demolition contractor,
Controlled Group of Ossett,
for a six month contract.
Main contractor, the
Wates Group, specified that
plant working within the
building had to have an
exhaust gas purification
system fitted to conform to
health and safety
regulations regarding
exhaust emissions in an
enclosed space.
Venco Plant Services was
asked to ensure that an
appropriate exhaust gas
filtration system was fitted
to the 1.6t machines.
Danny Spaven, Venco
Plant Services' MD – hire
division – says "After
researching the market for a
suitable exhaust gas
filtration system which met
the required health and
safety standards, we sourced
the complete filter assembly
from EHC Teknik." |